Watch NASA’s massive Artemis 2 rocket core stage arrive in Florida. Next stop: the moon (video, photos)

When you buy through links on our articles, Future and its syndication partners may earn a commission.

 A rocket on its side going into a large building that has banners for the artemis program, the u.s. flag and nasa at the top.

The core stage for Artemis 2’s Space Launch System arrives at the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, nearby the launch pad, on July 24, 2024. | Credit: NASA/Isaac Watson

An astronaut crew’s rocket made its last major journey on Earth before blasting off for the moon.

The core stage of Artemis 2‘s rocket came to NASA’s Kennedy Space Center (KSC) in Florida on Tuesday (July 23). The rocket stage was offloaded from NASA’s Pegasus barge, which shipped the rocket stage 900 miles (1,450 km) by water from NASA’s Michoud Assembly Facility in New Orleans, in a seven-hour operation aided by remote controlled vehicles known as self-propelled modular transporters.

The 212-foot (65-meter) stage then made the half-mile (0.8 km) journey to NASA’s Vehicle Assembly Building where it will eventually be joined to the rest of the Space Launch System rocket for a launch no earlier than September 2025.

Related: NASA rolls giant Artemis 2 moon rocket core off the factory floor for astronaut mission (video)

a rocket on its side going into a large building that has banners for the artemis program, the u.s. flag and nasa at the topa rocket on its side going into a large building that has banners for the artemis program, the u.s. flag and nasa at the top

a rocket on its side going into a large building that has banners for the artemis program, the u.s. flag and nasa at the top

“Our team has been chomping at the bit trying to get flight hardware back to KSC,” Sean Arrieta, KSC’s operations manager for integrated operations in exploration ground systems, said in an X livestream Wednesday (July 24).

a big rocket on its side emerges from a storage facility. four engines are visible with plastic covers on the bells. a lot of people in green and orange construction photos stand nearbya big rocket on its side emerges from a storage facility. four engines are visible with plastic covers on the bells. a lot of people in green and orange construction photos stand nearby

a big rocket on its side emerges from a storage facility. four engines are visible with plastic covers on the bells. a lot of people in green and orange construction photos stand nearby

“We really appreciate everything that the Space Launch System team has been doing to get the vehicle ready and manufactured for us, as well as Boeing, who manufactures the stage. Our team is ready to go,” he continued.

a square-shaped building with an american flag and nasa logo seen from far away. also visible is water with a long, low barge on ita square-shaped building with an american flag and nasa logo seen from far away. also visible is water with a long, low barge on it

a square-shaped building with an american flag and nasa logo seen from far away. also visible is water with a long, low barge on it

“When we get in the VAB, we’ll go ahead and set that [core stage] down on some skid beams, where it’ll remain for four to five weeks for some pre-processing, and then we’ll get ready for its next steps in operations,” Arietta said.

a big rocket is visible from the back, with engines wrapped in plastic. it lies inside a horizontal storage facility. in front, people walk towards the rocketa big rocket is visible from the back, with engines wrapped in plastic. it lies inside a horizontal storage facility. in front, people walk towards the rocket

a big rocket is visible from the back, with engines wrapped in plastic. it lies inside a horizontal storage facility. in front, people walk towards the rocket

RELATED STORIES:

— NASA rolls giant Artemis 2 moon rocket core off the factory floor for astronaut mission (video)

— ‘We’re pushing the limits:’ Artemis 2 backup astronaut on 2025 round-the-moon mission (exclusive)

— ‘That’s part of space exploration’: Artemis 2 astronauts unfazed by moon mission delays (exclusive)

Artemis 2 aims to send four astronauts around the moon in the first human lunar mission since Apollo 17 in 1972. The crew includes NASA commander Reid Wiseman, NASA pilot Victor Glover, NASA mission specialist Christina Koch and Canadian Space Agency (CSA) astronaut and mission specialist Jeremy Hansen. Glover will be the first Black person to leave low Earth orbit, while Koch and Hansen will be the first woman and non-American, respectively.

The mission was delayed nine months in January 2024 in part due to issues with the heat shield identified on the last mission, the uncrewed Artemis 1 that flew in late 2022. Troubleshooting is ongoing on that item, but assembly and training continue with the Orion spacecraft, SLS and other things.

Reference

Denial of responsibility! Web Today is an automatic aggregator of Global media. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, and all materials to their authors. For any complaint, please reach us at – [email protected]. We will take necessary action within 24 hours.
DMCA compliant image

Leave a Comment